Enter three things. We compare the full delivered cost of a SIP shell against conventional stick framing, including schedule, waste, and quality costs most bids leave out.
Estimated savings with SIPs
$ —
Schedule— days faster
Stick framing total—
SIP total—
Fill in ZIP, square footage and basement above. The estimate appears instantly, no signup, nothing to submit.
Where the money goes cost categories that differ by method
Line by line every number shows its math
Item
Stick framing
SIPs
SIP advantage
Assumptions every default is editable and sourced
Adjust assumptions
defaults from SIPA, NAHB, IBACOS
Refine this estimate the three inputs that matter most
Directional estimate only. This tool models national and regional industry averages from the sources labeled on each assumption. Actual SIP package quotes, framing bids, labor rates, and lender carrying costs vary by supplier, design complexity, and market. Replace the defaults above with your real bid numbers before using this in a budget. This is not a quote and not a substitute for supplier pricing.